Repair or replace? How to assess guestroom casegoods before a hotel refurbishment
A practical tender brief for wardrobes, desks and headboards in UAE hotel projects, from condition surveys and operator approval to comparing cost per room.
Marriott’s public advisory for The St. Regis Saadiyat Island Resort in Abu Dhabi describes phased enhancements to guestrooms and suites through the end of 2027. In a phased refurbishment, the hotel operator needs an item-by-item decision before rooms come off sale. A condition survey will show which casegoods can stay, which need work and which should be priced for replacement.
99 Points acceptance checklist for refurbished guestroom furniture
For each item, record the proposed repair, acceptable finish, checks on operation and fixings, replaceable parts and planned room downtime on one line. Ask the operator and project team to sign off the mock-up, then apply the same criteria to other rooms of that type. If the trial fails, ask for a separate price and schedule covering the replacement item, making good and room downtime before choosing whether to replace a part or the whole unit.
Walk one good room and one heavily worn room of each relevant type
Split each item into its carcass, finish, moving hardware and wall or floor fixings. Photograph the damage against a room number and asset reference. At a wardrobe, open the doors and check whether the hinges still hold securely. At a desk, inspect the base and its joints. For a fitted headboard, have the site team check fixings and any service interfaces before allowing work.
- Price local repair where the substrate and fixings are sound, and the wear is limited to the finish or a readily replaceable part.
- Trial new hardware or a replacement front where the carcass remains serviceable. Confirm hole centres, clearances and compatible spares.
- Ask for a replacement option where fixings repeatedly pull out, moisture has damaged the structure, or a trial repair cannot reach the specified condition. Refer items with an immediate safety concern to the hotel’s site team.
Give both bidders the same BOQ and approval room
On the bill of quantities, list the rooms and items to retain, refinish or replace. Tell bidders which finishes, substrates and fittings have to match retained furniture. Trial a repair in a representative room and get the operator and consultant to review it in the room’s lighting. Open drawers and doors, test cleaning access and make sure the maintenance team can obtain replacement hardware.
Have both bidders separate removal, protection, labour, materials, disposal and making good. Put the number of days the room will be out of service beside the cost per room. A low repair price can become less attractive if the team has to return for repeated touch-ups or wait for bespoke parts.
Give housekeeping and engineering an item-level record
If the mock-up supports keeping most wardrobe carcasses but the survey identifies a few failed cabinets near wet areas, specify those exceptions by room number. Identify which item receives the replacement, who makes good adjacent finishes and which parts go into the handover record. The operator can then check that each reopened room received the work that was priced.
Procurement questions
Can scratched hotel furniture be refinished in place?
Trial it on a representative item first. Check that the substrate and fixings are sound, that the work can be contained to an approved room and time slot, and that the finish passes the mock-up under guestroom lighting.
Can we keep the wardrobe carcass and replace just the doors?
Include it as a priced option. Measure the opening and hinge positions, and check the side panels can take the new door weight. At the mock-up, check the door gaps, the clearance to adjacent furniture and the match to the retained finishes.