V001–V004 show different cabinet, mirror and basin arrangements. List the lower cabinet, mirror cabinet, counter and basin as separate items before comparing a package price. A tap or accessory in a picture is not automatically included.
Coordinate before fabrication
Confirm the basin opening, waste route, wall construction and mounting approach with the relevant project parties. Mark the selected finish and the areas exposed to moisture in the specification, using the actual material documents rather than a generic performance claim.
Read the image as a reference
The improved vanity image follows the original product arrangement. Its visible texture and lighting help compare a direction; sample review and approved drawings still define the final product.
Avoid treating the basin and cabinet as one assumption
A selected basin or worktop can change the information required for the cabinet. Record the actual product reference and coordinate openings and support with the responsible parties instead of reading these conditions from the image.
Make the review practical
Check cabinet access, usable storage and access to the services on the project drawing. Define the proposed materials and finishes using product information and samples, without assuming a performance grade from a wood-tone visual.
Information to prepare
| Item | Confirm for the project |
|---|---|
| Dimensions | Overall sizes, site conditions and the applicable drawing revision. |
| Construction | Proposed substrate, build-up, joints and edge treatment. |
| Interfaces | Related services, supporting construction and installation responsibility. |

Source reference: A4
