Define responsibilities for production, packing, transport, export and destination formalities, unloading, storage, installation and after-sales support. Align package labels and schedules with rooms or cabinet IDs, and confirm destination requirements before ordering. Trade terms, payment, insurance, damage handling and warranty scope must be agreed contractually; overseas project photos do not establish these terms.
Use a responsibility schedule
Name the responsible party for measurements, production information, export packing, freight, customs, unloading, storage and installation. Agree the relevant destination requirements before the order is finalized.
Connect packages with rooms
Room numbers, cabinet IDs and package labels should follow a shared schedule. Define how missing or damaged items will be recorded and how installation questions will be referred back to the approved drawings.