Overseas furniture quotations payment installation and warranty

Define products, packing, sea freight, local installation and after-sales scope. The stated payment arrangement is a 30 percent deposit with the balance settled by shipment.

Overseas furniture quotations payment installation and warranty — Furniture scope illustration. Dimensions and construction follow the project drawings.
Furniture scope illustration. Dimensions and construction follow the project drawings.
  1. 01 Kitchen cabinets
  2. 02 Storage cabinets
  3. 03 Functional cabinets

An overseas furniture quotation should set out both the products and the delivery work. 99 Points quotes against the delivery scope requested by the customer. This batch of project records lists custom production, export packing, sea freight and local installer coordination. The party performing each task and its charges should be specified in the quotation.

Define the work included in the price

StageDetails to agree
ProductionItem schedule, drawing revision, materials, finishes, quantities and coordinated equipment.
Export and transportPacking, shipment batches, transport endpoint, and responsibility for clearance, duties and insurance.
Site workUnloading, internal handling, site readiness, local installers, tools and responsibility for remedial work.
After-salesWarranty coverage and start date, issue reporting, parts supply, site repairs and related costs.

Record payment milestones in the contract

The stated standard payment arrangement is a 30 percent deposit with the balance settled by shipment. The contract should also define documents and inspection arrangements for each payment milestone. Changes to drawings or supply scope should record additional costs, change fees and timing implications.

Confirm installation coordination and warranty

Coordination with local installers does not establish a directly employed 99 Points installation team in every destination. Travel, accommodation, local labor and repair response arrangements need project-specific agreement. The completed service fields in this batch record a two-year warranty; start dates, covered items, exclusions and handling arrangements follow the project contract.

State the intended delivery point and site work scope when requesting a quotation. Minimum order size, lead time, sample cost and spare-parts arrangements should be confirmed before placing the order.

Which location marks the end of the sea freight quotation?

Name the agreed handover point, such as a port, warehouse or project site. Record clearance, duties, unloading and sign-off separately, with an agreed party for each. See the shipping and site handover guide for a breakdown of those responsibilities.

Source: 99 Points project and product service records.

For a similar space, prepare the layout, furniture schedule, project location and requirements for the selected materials and finishes.
Furniture scheme illustration. See the recorded project scope below.
Thank You
Your enquiry has been saved.
Please check your details and try again.
Thank You
Your enquiry has been saved.
Please check your details and try again.