Furniture project coordination for designers and contractors

Connect drawings, materials, samples, product schedules, production, shipping and site installation, with agreed deliverables and responsibilities.

Furniture project coordination for designers and contractors — Furniture scope illustration. Dimensions and construction follow the project drawings.
Furniture scope illustration. Dimensions and construction follow the project drawings.
  1. 01 Decorative panels
  2. 02 Kitchen cabinets
  3. 03 Storage cabinets

99 Points can coordinate cabinetry and furniture packages with designers, main contractors, procurement teams and local installers. Translate design requirements into product schedules, dimensions and interfaces before arranging fabrication and delivery.

Translate design requirements into product information

Organize furniture identifiers, drawing revisions, materials, finishes and quantities by space and room type. For samples or sample rooms, agree review criteria, scope and approval records. Detail drawing, site measurement and sample services are defined for the project.

Assign delivery responsibilities

The overseas records list custom production, export packing, sea freight and local installer coordination. Agree clearance, unloading, movement to floors, equipment interfaces, installation, remedial work and acceptance documents, with responsibilities and costs recorded in the quotation and contract.

Keep changes and milestones on the same revision

When design, quantities or site conditions change, identify affected items, drawing revisions, costs and delivery milestones. The agreed schedule and change records become the common basis for fabrication and site coordination.

What should design and procurement confirm after a drawing revision?

List the affected rooms and furniture references, then note what changes in quantity, sample approval, cost and orders already placed. The drawing revision and sign-off guide shows how to identify the approval owner and the revision to issue to the factory and site teams.

Source: 99 Points project and product service records.

For a similar space, prepare the layout, furniture schedule, project location and requirements for the selected materials and finishes.
Furniture scheme illustration. See the recorded project scope below.
Thank You
Your enquiry has been saved.
Please check your details and try again.
Thank You
Your enquiry has been saved.
Please check your details and try again.